Time-to-plan lags for commercial construction projects

Abstract: Time-to-Plan Lags for Commercial Construction Projects

Download PDF

We use a large project-level dataset to estimate the length of the planning period for commercial construction projects in the United States. We find that these time-to-plan lags are long, averaging about 17 months when we aggregate the projects without regard to size and more than 28 months when we weight the projects by their construction cost. The full distribution of time-to-plan lags is very wide, and we relate this variation to the characteristics of the project and its location. In addition, we show that time-to-plan lags lengthened by 3 to 4 months, on average, over our sample period (1999 to 2010). Regulatory factors are associated with variations in planning lags across locations, and we present anecdotal evidence that links at least some of the lengthening over time to heightened regulatory scrutiny. 

Also Visit
AEIdeas Blog The American Magazine
About the Author

 

Stephen D.
Oliner

What's new on AEI

Making Ryan's tax plan smarter
image The teacher evaluation confronts the future
image How to reform the US immigration system
image Inversion hysteria
AEI on Facebook
Events Calendar
  • 25
    MON
  • 26
    TUE
  • 27
    WED
  • 28
    THU
  • 29
    FRI
Wednesday, August 27, 2014 | 3:00 p.m. – 4:15 p.m.
Teacher quality 2.0: Toward a new era in education reform

Please join AEI for a conversation among several contributors to the new volume “Teacher Quality 2.0: Toward a New Era in Education Reform” (Harvard Education Press, 2014), edited by Frederick M. Hess and Michael Q. McShane. Panelists will discuss the intersection of teacher-quality policy and innovation, exploring roadblocks and possibilities.

No events scheduled this day.
No events scheduled this day.
No events scheduled this day.
No events scheduled this day.
No events scheduled today.
No events scheduled this day.
No events scheduled this day.